Buggy Tunnel
Hann Reserve, Bamban Tarlac
— Scope of Work
Project Overview
The scope of work for the buggy tunnel included gravel bedding preparation, reinforcement steel installation, formwork erection, and concrete pouring. The structure comprised four wing walls and approximately 21.5 linear meters of tunnel construction.
Duration: 6 weeks
Floor Area: 129 sq.m