The scope of work for the helipad included gravel bedding preparation, reinforcement steel fabrication and installation, formwork erection, and concrete pouring. The structure comprises twelve (12) reinforced concrete columns, twenty (20) beams, and a reinforced concrete slab forming the main deck.