Culverts and Drainage – Cabalayan – Sta Monica Farm To Market Road

Project Overview

The scope of work included the excavation for drainage systems and culvert structures, rebar fabrication and installation for the culverts, reinforced concrete pipe (RCP) installation, and concrete finishing for the drainage works. The total volume of excavation for these structures reached 1,263.67 cubic meters, while the total length of the constructed drainage system was 267 linear meters. The installed pipes have a diameter of 910 mm.

The project involved the construction of three types of culvert structures, namely: double-barrel pipe culverts, single-barrel pipe culverts, and box culverts. Each type was selected and implemented based on specific site conditions and hydraulic requirements, ensuring efficient water conveyance and structural stability.
All works were carried out in accordance with approved plans and specifications, maintaining quality standards and ensuring the durability and functionality of the drainage system.

Behind the Build

Related Projects

Scroll to Top