Project Overview
The scope of work covered the complete structural construction of the tank, from lean concrete placement through to the casting of the top slab. Our team executed reinforcement steel fabrication and installation for the base slab, retaining walls, and top slab with strict adherence to structural specifications.
Duration: 2 months.
Floor Area: 338.14 sq.m.