The scope of work covered the complete structural construction of the tank, from lean concrete placement through to the casting of the top slab. Our team executed reinforcement steel fabrication and installation for the base slab, retaining walls, and top slab with strict adherence to structural specifications.

Meva formwork systems were utilized for the wall and top slab construction, ensuring high-quality surface finishes and dimensional accuracy. Concrete was placed using pumpcrete to achieve efficient pouring, proper compaction, and superior structural integrity. The works were delivered in full compliance with project quality and safety standards.