Culverts and Drainage – Cabalayan – Sta Monica Farm To Market Road
Brgy. Cabalayan, Sta Monica, Bauang La Union
— Scope of Work
Project Overview
The scope of work included the excavation for drainage systems and culvert structures, rebar fabrication and installation for the culverts, reinforced concrete pipe (RCP) installation, and concrete finishing for the drainage works. The total volume of excavation for these structures reached 1,263.67 cubic meters, while the total length of the constructed drainage system was 267 linear meters. The installed pipes have a diameter of 910 mm.
Length: 267 l.m