Powerhouse Retaining Wall

The scope of work covered the construction of the Powerhouse Retaining Walls, starting from lean concrete placement up to full structural completion and finishing works. The retaining walls vary in height due to the sloping road elevation, requiring careful setting out and continuous elevation monitoring throughout the construction process.

Powerhouse Retaining Wall Read More »

img 6409

KJ Choi Watertank

The scope of work covered the complete structural construction of the tank, from lean concrete placement through to the casting of the top slab. Our team executed reinforcement steel fabrication and installation for the base slab, retaining walls, and top slab with strict adherence to structural specifications.

KJ Choi Watertank Read More »

img 6804

Buggy Tunnel

The scope of work for the buggy tunnel included gravel bedding preparation, reinforcement steel installation, formwork erection, and concrete pouring. The structure comprised four wing walls and approximately 21.5 linear meters of tunnel construction.

Buggy Tunnel Read More »