img 9570

Clubhouse Retaining Wall

The scope of work covered construction from lean concrete up to the completion and finishing of the retaining walls. Within the Hann Reserve Project, our team successfully constructed three retaining walls, consisting of two curved retaining walls and one retaining wall integrated with a suspended slab system. The unique geometrical configurations and varying elevations presented significant execution and safety challenges.

Clubhouse Retaining Wall Read More »

img 1542

Gabions

The scope of work for the gabion project involved the construction of slope protection along Main Road 1 and Main Road 5 at the Hann Reserve. Together with my team, we carried out the installation in accordance with approved drawings, technical specifications, and established construction procedures.

Gabions Read More »

img 6214

Relay Pumps

The scope of work comprised the complete structural construction of 12 relay pump tanks, from lean concrete placement through to the casting of the top slabs. The project included 8 tanks constructed based on typical design configurations and 4 tanks with varying structural designs.

Relay Pumps Read More »