cc159179 fdc0 4066 842c 00fedc13facc

Culverts and Drainage – Cabalayan – Sta Monica Farm To Market Road

The scope of work included the excavation for drainage systems and culvert structures, rebar fabrication and installation for the culverts, reinforced concrete pipe (RCP) installation, and concrete finishing for the drainage works. The total volume of excavation for these structures reached 1,263.67 cubic meters, while the total length of the constructed drainage system was 267 linear meters. The installed pipes have a diameter of 910 mm.

Culverts and Drainage – Cabalayan – Sta Monica Farm To Market Road Read More »

img 3507

Saddles

Installation of concrete or steel pipe saddles designed to support pipelines and distribute loads evenly along the pipeline route.

Saddles Read More »

img 6004

Powerhouse Retaining Wall

The scope of work covered the construction of the Powerhouse Retaining Walls, starting from lean concrete placement up to full structural completion and finishing works. The retaining walls vary in height due to the sloping road elevation, requiring careful setting out and continuous elevation monitoring throughout the construction process.

Powerhouse Retaining Wall Read More »

img 9570

Clubhouse Retaining Wall

The scope of work covered construction from lean concrete up to the completion and finishing of the retaining walls. Within the Hann Reserve Project, our team successfully constructed three retaining walls, consisting of two curved retaining walls and one retaining wall integrated with a suspended slab system. The unique geometrical configurations and varying elevations presented significant execution and safety challenges.

Clubhouse Retaining Wall Read More »

Scroll to Top