img 6409

KJ Choi Watertank

The scope of work covered the complete structural construction of the tank, from lean concrete placement through to the casting of the top slab. Our team executed reinforcement steel fabrication and installation for the base slab, retaining walls, and top slab with strict adherence to structural specifications.

KJ Choi Watertank Read More »

img 1542

Gabions

The scope of work for the gabion project involved the construction of slope protection along Main Road 1 and Main Road 5 at the Hann Reserve. Together with my team, we carried out the installation in accordance with approved drawings, technical specifications, and established construction procedures.

Gabions Read More »

f90f43188f02a6069aa9f8f9a37a919f

Helipad

The scope of work for the helipad included gravel bedding preparation, reinforcement steel fabrication and installation, formwork erection, and concrete pouring. The structure comprises twelve (12) reinforced concrete columns, twenty (20) beams, and a reinforced concrete slab forming the main deck.

Helipad Read More »

img 6214

Relay Pumps

The scope of work comprised the complete structural construction of 12 relay pump tanks, from lean concrete placement through to the casting of the top slabs. The project included 8 tanks constructed based on typical design configurations and 4 tanks with varying structural designs.

Relay Pumps Read More »

img 6804

Buggy Tunnel

The scope of work for the buggy tunnel included gravel bedding preparation, reinforcement steel installation, formwork erection, and concrete pouring. The structure comprised four wing walls and approximately 21.5 linear meters of tunnel construction.

Buggy Tunnel Read More »

Scroll to Top